
Commercial Construction Estimating Services
Send your plans for a commercial construction estimate or quantity takeoff. We prepare Excel workbooks for US general contractors and subcontractors bidding offices, retail, warehouses, healthcare projects and tenant improvements. Most estimates are delivered in 24–48 hours. Your written quote confirms the trades, deliverables, fee and deadline.
What should I send for a commercial estimate?
Send the drawing issue, the project state, the bid date, and the trades to include. A quantity takeoff and a priced estimate are different requests. Say which one you need.
Redacted takeoffs from real commercial jobs
Client details are redacted and the files are shared with permission. Open a workbook or a markup preview, then send your own drawings.
What is a commercial building estimate?
It is a documented scope for one commercial building: measured quantities, named exclusions, and pricing inputs when you ask for them. It is not a single-trade shop count and it is not a software seat.
How much does an estimate cost?
An estimate typically costs $150–$1,000. The amount depends on project size and scope.
How fast?
Most estimates are delivered in 24–48 hours.
What does Commercial Estimate Pro prepare?
Multi-trade commercial building estimates and quantity takeoffs for US general contractors and commercial subcontractors. The workbook is scoped from the drawings you send. It is not estimating software and it is not a free bid template.
How is a commercial bid package organized?
Rows are grouped so shell, structure, interiors, and building systems stay readable. Alternates, allowances, and owner-furnished items are labeled instead of being folded into one total. Each measured line keeps a unit and a drawing reference.
Which files should I send with a request?
Send the current architectural, structural, and MEP issues, specifications, addenda, the project location, and the bid deadline. Name the trades you want measured and whether you need quantities only or a priced estimate.
Where is Commercial Estimate Pro located?
Phone, WhatsApp, and email are published on the contact page. A street address is not published. United States commercial bids are the primary work. State pages do not mean a local office.
Do you take commercial bids outside the United States?
Canada, the United Kingdom, Australia, and the United Arab Emirates can be reviewed from the same desk. Name the unit system and the currency in the request. No office is listed in those countries.
Where are the fee and the delivery window explained?
The pricing page states the usual fee band and that most packages go out in 24-48 hours after the quote is accepted. The written quote is the price and the deadline for your drawings. No coupon is advertised.
Which commercial estimating package matches the bid?
Pick the output first. Quantities, material schedules, priced costs, and early budgets answer different questions.

Commercial Construction Estimating
One coordinated workbook for architectural, structural and MEP bid packages.
VIEW PACKAGE ↗
Commercial Cost Estimating
Separate labor, material, equipment and subcontract prices with a stated rate basis.
VIEW PACKAGE ↗
Commercial Quantity Takeoff
Measured quantities tied to the plans, with units and deductions ready for your pricing team.
VIEW PACKAGE ↗
Commercial Material Takeoff
Product, grade, size and order allowances for supplier pricing and buyout.
VIEW PACKAGE ↗
Commercial Bid Estimating
A workbook organized around your bid form, alternates and unit-price items.
VIEW PACKAGE ↗
Commercial Preliminary Estimating
An early estimate from concept drawings with allowances for open design choices.
VIEW PACKAGE ↗
How do shell, tenant, and trade scopes stay separate?
A repeated floor plan does not mean every level has the same finishes or equipment. The estimate keeps shell, core, and fit-out identifiable, and it keeps a trade quantity from being priced again inside a subcontractor quote.
- Drawing issue and addenda on the register
- Units that are not added together
- Alternates off the base scope
- Exclusions written before bid day
Which trades can be measured in the same bid?
Review the drawing inputs and units for the trades you need. Your quote confirms which trades and interfaces are included.
Which commercial buildings are these estimates written for?

Office Buildings
SEE SCOPE BOUNDARIES ↗
Retail Stores
SEE SCOPE BOUNDARIES ↗
Warehouses
SEE SCOPE BOUNDARIES ↗Browse offices, retail, warehouses, and other building types →
Commercial bids in the US, with remote review for four other countries
General contractor bid packages in the United States are the work this desk is built for. The same drawing review can cover a commercial set in Canada, the United Kingdom, Australia, or the United Arab Emirates when the request names the units and the currency. No office is published in those countries, and a state page is not a US office.
Review US project-location requirements or contact the estimating desk.
What files can a bid package include?
An Excel takeoff, a priced estimate when you ask for rates, and color-coded PDF markups when the quote includes them. Redacted samples of that work are on the sample estimates page. Quantity excerpts show units only.