Commercial HVAC Takeoff for Building Bids

Commercial HVAC takeoff keeps supply, return, exhaust, and outside air apart. Linear feet of duct are not sheet-metal area, and sheet-metal area is not equipment.

commercial rooftop air-handling unit with galvanized ductwork, access panels and a technician inspecting ventilation connections.
Construction estimating visual
PROJECT INQUIRY

How do I request this commercial estimate?

Send mechanical plans, equipment schedules, and the specification section that states the duct measurement basis.

HVAC scope is typically turned around in 24–48 hours for most estimates. The fee is typically $150–$1,000 per estimate and depends on project size and scope.

  • Controls and commissioning scope
  • Piping versus ductwork boundaries
  • Coordination with electrical work

Request a Commercial Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

DIRECT ANSWER

How is commercial ductwork quantified?

A straight rectangular run can be recorded as LF by size or as nominal surface. For an 18 by 12 inch duct, the four-sided perimeter is 60 inches, or 5 feet. A 24-foot run is 120 SF of nominal surface before fittings, seams, and waste. Diffusers and equipment are counted from schedules by tag. Insulation, controls, test-and-balance, and rigging are separate lines. The Excel file labels the measurement basis so a square-foot rate is not applied to a linear-foot quantity.

SCOPE AND DELIVERABLES

What should the workbook list?

01

Drawings to send

  • Mechanical floor plans
  • Equipment and diffuser schedules
  • Mechanical specifications
02

What is counted

  • Straight duct by size, as length or nominal surface, before fittings
  • Fittings, transitions, and reinforcement on the basis the specification states
  • Air devices reconciled from the plan to the diffuser schedule
  • Equipment by tag from the equipment schedule
  • Insulation, controls, and test-and-balance as their own scope lines
03

Scope checks

  • Controls and commissioning scope
  • Piping versus ductwork boundaries
  • Coordination with electrical work
04

CSI MasterFormat

  • CSI MasterFormat Division 23
05

Industry takeoff software

  • HVAC quantities are commonly measured with PlanSwift, Bluebeam, or similar on-screen takeoff software. Those names are tools used in the industry. This site does not claim a license for them, and it does not claim their native files are the deliverable. The package described here is an Excel workbook, with color-coded PDF markups when the written quote includes them.
ILLUSTRATIVE LINES

Sample line items for this scope

These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.

Line itemUnit or basisDrawing referenceReview note
Straight duct surfaceSFDuct planNominal four sides before fittings
Duct by sizeLFDuct planUse this when the spec prices by length
Air devicesEADiffuser scheduleReconcile tags to the plan
EquipmentEAEquipment scheduleInsulation and controls excluded unless specified

A related teaching file is available: HVAC takeoff worksheet. It is not a bid deliverable.

Open the source-mapped quantity excerpt for this trade.

MEASUREMENT NOTES

How is this scope measured?

Measurement method for CSI division 23

Trace supply, return, exhaust and outside-air systems separately. Duct quantities need dimensions and a stated basis such as LF by size or developed surface SF; reconcile air devices and equipment tags to schedules.

Insulation, controls, testing and balancing, startup and rigging are separate scope decisions. LF of duct cannot be converted into sheet-metal weight without geometry and material thickness.

Teaching calculation

Illustrative duct run: 24 LF of 18 x 12 in duct is a linear measurement, not duct surface area. For four-sided straight duct, nominal sheet-metal area is 24 x (2 x 18 + 2 x 12) / 12 = 120 SF, before fittings and allowances.

QUESTIONS

Questions about Commercial HVAC Takeoff for Building Bids

Does 120 SF include fittings?

No. That figure is nominal straight-duct surface only. Elbows, transitions, and reinforcement need their own basis from the specification.

Are controls in the HVAC package?

Only when the documents say so. A controls contractor and a sheet-metal contractor can both touch the same air handler.

How are air devices checked?

Match tags on the plan to the schedule. A count of symbols is not enough when the schedule lists a different model or quantity.

SCOPE BOUNDARIES

What this page does not decide

Inclusions, exclusions, and whether this trade is in your package are confirmed in the project quote. This page does not certify design or code compliance. PlanSwift and Bluebeam are named only as tools used in the industry.