Documents and inputs
- Invitation to bid and bid forms
- Issued-for-bid drawing and specification set
- Bid addenda, alternates and deadline
Get a commercial estimate organized around the bid form your team needs to complete. Base scope, alternates, unit-price items and addenda stay traceable to the issued documents.

Attach the invitation, the bid form, the latest addendum number, and the submission deadline.
Bid-form packages typically land between $150 and $1,000 per estimate once size and scope are clear. Delivery for most estimates is 24–48 hours.
Base scope, alternates, unit-price items, and allowances are separate totals until the bid form says to combine them. Each quantity is tied to a drawing issue so a late addendum can be checked without rebuilding the whole file. Owner-furnished equipment and exclusions between subcontractors are written down. Bid submission, bonds, and contract negotiation stay with your team. The estimate makes those decisions reviewable. It does not file the bid.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Base bid scope | As the bid form requires | Invitation and bid form | Do not fold in alternates |
| Alternate A | Separate total | Bid form alternate list | Own quantities and exclusions |
| Unit-price item | Unit named on the form | Bid form | Match the requested unit exactly |
| Addendum delta | Sheet and quantity change | Addendum log | Keep the prior issue readable |
Send the invitation to bid, bid form and latest addenda with the drawing set. Identify the base bid, alternates, unit-price items and allowances your submission must show. Include the bid deadline and any required breakdown so the estimate can be scoped around the tender requirements.
Keep base scope and alternates separate, and track which drawing issue each quantity belongs to. Clarify owner-furnished equipment, contractor installation and exclusions between subcontractors. Your team remains responsible for the submitted bid and contract terms; the estimating package should make those decisions easier to review.
Bid estimating tracks addenda, bid forms, alternates and trade exclusions as well as measured quantities.
Commercial bid estimating prepares a scope-based estimate against tender instructions, with addenda, alternates, clarifications and exclusions tracked separately.
Illustrative bid comparison: base scope $50,000, separately identified alternate A $4,000 and alternate B $2,500. A base bid remains $50,000 until the solicitation explicitly requests alternates in the submitted total.
Send the addendum number and the sheets it changes. Revised quantities are logged against the baseline instead of being mixed into the original rows.
Only if the bid form says so. Otherwise Alternate A and Alternate B remain visible options with their own quantities.
The bidding contractor. This desk documents scope, quantities, and the stated pricing inputs. It does not accept award or contract risk.
Bid submission, contract negotiation and bid award are separate activities.