Get a commercial estimate organized around the bid form your team needs to complete. Base scope, alternates, unit-price items and addenda stay traceable to the issued documents.

contractor reviewing an organized tender package with drawing rolls, tabbed bid documents, calculator and commercial site visible through window.
Construction estimating visual
PROJECT INQUIRY

How do I request this commercial estimate?

Attach the invitation, the bid form, the latest addendum number, and the submission deadline.

Bid-form packages typically land between $150 and $1,000 per estimate once size and scope are clear. Delivery for most estimates is 24–48 hours.

  • Confirm bid form requirements
  • Identify scope gaps between trades
  • Review addenda before submission

Request a Commercial Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

DIRECT ANSWER

What does a commercial bid estimate follow?

Base scope, alternates, unit-price items, and allowances are separate totals until the bid form says to combine them. Each quantity is tied to a drawing issue so a late addendum can be checked without rebuilding the whole file. Owner-furnished equipment and exclusions between subcontractors are written down. Bid submission, bonds, and contract negotiation stay with your team. The estimate makes those decisions reviewable. It does not file the bid.

SCOPE AND DELIVERABLES

What should the workbook list?

01

Documents and inputs

  • Invitation to bid and bid forms
  • Issued-for-bid drawing and specification set
  • Bid addenda, alternates and deadline
02

Workbook outputs

  • Trade-level estimate structure
  • Bid clarification and exclusion register
  • Alternates and allowance tracking
03

Review checks

  • Confirm bid form requirements
  • Identify scope gaps between trades
  • Review addenda before submission
ILLUSTRATIVE LINES

Sample line items for this scope

These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.

Line itemUnit or basisDrawing referenceReview note
Base bid scopeAs the bid form requiresInvitation and bid formDo not fold in alternates
Alternate ASeparate totalBid form alternate listOwn quantities and exclusions
Unit-price itemUnit named on the formBid formMatch the requested unit exactly
Addendum deltaSheet and quantity changeAddendum logKeep the prior issue readable
MEASUREMENT NOTES

How is this scope measured?

Match the estimate to the tender you must submit

Send the invitation to bid, bid form and latest addenda with the drawing set. Identify the base bid, alternates, unit-price items and allowances your submission must show. Include the bid deadline and any required breakdown so the estimate can be scoped around the tender requirements.

Keep base scope and alternates separate, and track which drawing issue each quantity belongs to. Clarify owner-furnished equipment, contractor installation and exclusions between subcontractors. Your team remains responsible for the submitted bid and contract terms; the estimating package should make those decisions easier to review.

Scope example and review questions

Bid estimating tracks addenda, bid forms, alternates and trade exclusions as well as measured quantities.

Commercial bid estimating prepares a scope-based estimate against tender instructions, with addenda, alternates, clarifications and exclusions tracked separately.

Illustrative calculation

Illustrative bid comparison: base scope $50,000, separately identified alternate A $4,000 and alternate B $2,500. A base bid remains $50,000 until the solicitation explicitly requests alternates in the submitted total.

  • Does the bid form require unit prices or alternates?
  • Have all addenda been acknowledged?
QUESTIONS

Questions about Commercial Bid Estimating Services

What if an addendum arrives after the takeoff starts?

Send the addendum number and the sheets it changes. Revised quantities are logged against the baseline instead of being mixed into the original rows.

Should alternates be inside the base number?

Only if the bid form says so. Otherwise Alternate A and Alternate B remain visible options with their own quantities.

Who is responsible for the number on the bid form?

The bidding contractor. This desk documents scope, quantities, and the stated pricing inputs. It does not accept award or contract risk.

SCOPE BOUNDARIES

What this page does not decide

Bid submission, contract negotiation and bid award are separate activities.