Building size
More floor area, more levels, and more sheets mean more items to measure and more interfaces to keep apart. A single-story shell is not priced like a multi-story medical fit-out of the same footprint.
The written quote is the price for your drawings. The band on this page is what a typical commercial package costs. It is not a coupon, and it is not the number you put on a bid form.

An estimate typically costs $150–$1,000, depending on project size and scope. Most estimates are delivered in 24–48 hours.
A smaller quantity takeoff for one trade sits toward $150. A general-contractor bid that reconciles several trades, alternates, and exclusions sits toward $1,000. If the set is larger than that band, the quote says so after the drawings are reviewed. There is no advertised percent-off, free first package, or limited-time rate.
Estimating work starts only after that quote is accepted. You still own the number on the bid form, including markup, bonds, and contract terms.
The same fee band does not mean every set takes the same hours. These are the three inputs the quote is built from.
More floor area, more levels, and more sheets mean more items to measure and more interfaces to keep apart. A single-story shell is not priced like a multi-story medical fit-out of the same footprint.
Name the trades you want. Concrete, envelope, interiors, and MEP are separate measurements. Adding a trade adds schedules and an exclusion line so the same sleeve is not priced twice.
A current architectural, structural, and MEP issue, with specifications and addenda, can be measured. Missing sheets, a raster scan without a scale, or an unnamed alternate stays an open question instead of a guessed quantity.
Most packages leave here in 24-48 hours after the quote is accepted and the drawings are complete enough to measure. That is the usual window, not a promise that every addendum or incomplete set hits the same clock. The date on the quote is the delivery commitment for that job.
United States commercial bids are the primary work. A commercial set in Canada, the United Kingdom, Australia, or the United Arab Emirates can be reviewed the same way when you name the unit system and the currency. No office is listed in those countries. State pages on this site are not local offices either.
The sample estimates page has redacted Excel takeoffs and markup previews from real commercial jobs, shared with permission. The review steps show the order used before a file is sent.
A typical package is quoted from $150 to $1,000. A short single-trade quantity set is the kind of job that lands toward the low end. A multi-trade general-contractor bid, with alternates and an exclusion register, is the kind of job that lands toward the high end. Work outside that band is still priced from the drawings. The figure in the written quote is the fee for that set.
Once you accept the quote and the sheets can be measured, most packages are delivered in 24-48 hours. A missing sheet, an unscaled scan, or an addendum that arrives mid-takeoff can move the date. The deadline written on the quote is the one that applies.
Three things: how large the building is, how many trades are in the request, and how complete the plans are. Floor area, sheet count, and the number of alternates all change the hours. A current issued set with schedules is faster to measure than a partial scan.
No. This page has no coupon, percent-off, or introductory rate. The written quote is the price.
Yes, as a remote drawing review. Say the country, whether you need imperial or metric units, and which currency the bid uses. The United States is the primary market. No office is published in those countries, and no street address is published in the United States either.
Include the project state or country, the trades, and whether you need quantities only or a priced estimate. The reply states the fee and the deadline before work starts.