An office estimate fails when the shell, the core, and a tenant fit-out are added as if they were one repeated floor. Lobbies and conference suites are not typical bays.

Say whether the bid is core and shell, a named tenant, or both, and send the riser diagrams with the architectural set.
Shell quantities stop at the base building. Each tenant fit-out has its own partition tags, finishes, and HVAC boxes. Shared risers and base-building air handlers are connection points, not a second full system inside the tenant number. A teaching note of 1,200 SF of tenant partition stays out of the shell board total. Excel tabs for shell, core, and tenant stop the same wall from being priced twice when drawings were issued on different dates.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Shell enclosure | SF | Elevations | Outside the tenant fit-out |
| Core partitions | SF | Core plan | Rated walls identified |
| Tenant partitions | SF | Tenant plan | Not added to shell board |
| Base-building air devices | EA | Mechanical riser | Tenant boxes listed separately |
Separate shell-and-core work from each tenant fit-out. Shared risers, base-building air systems and tenant electrical distribution need explicit connection boundaries; distinguish repeated typical floors from lobbies, conference suites and specialty rooms.
For an illustrative office fit-out, keep 1,200 SF of tenant partition area separate from core-and-shell scope; tenant and landlord responsibility must be documented.
Only after lobbies, toilets, and amenity rooms are removed from the typical plate. Those rooms are measured from their own plans.
The documents and the work letter decide. The estimate assigns it once, either in base building or in the tenant package.
Each phase keeps its drawing issue and its own exclusion list. A later tenant is not copied from an earlier one without a check.
A building type is not a completed portfolio and does not mean every trade is offered on every project. Deliverables are confirmed in the quote.