Commercial structural steel is a member register, not a tonnage guessed from building area. Weight needs the specified pounds per foot.

Send framing plans, member schedules, and say whether connection design, fabrication, and erection are one contract or several.
For most estimates, structural steel is delivered in 24–48 hours. The fee is typically $150–$1,000 per estimate and depends on project size and scope.
Each mark records section, length, and count. Eight members at 20 feet are 160 LF, and tons equal that length times the section weight per foot. Plates, bolts, and miscellaneous metals stay off the main member total when the documents list them separately. A schematic connection is not a fabrication bill of materials. Shop drawings, freight, and coatings are qualifications. The Excel register can be filtered by level so a mezzanine is not mixed into the roof steel.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Beams by mark | LF and tons | Framing plan | Section weight per foot required |
| Columns by mark | LF and tons | Column schedule | Count times length |
| Plates and misc. metals | LB or EA | Details | Off the main member total |
| Coatings | SF or ton | Specification | Fireproofing is not paint |
Build a member register by mark, section, length and count. Weight calculations require the specified section weight per length; keep plates, bolts and miscellaneous metals separate where documents define them.
Fabrication, erection, connection design, shop drawings, freight and coatings are separate qualifications. A schematic connection is not a complete fabrication bill of materials.
Illustrative member schedule: 8 members at 20 ft each equals 160 LF, but tonnage requires the specified weight per foot for each section; do not substitute length for steel weight.
Only if the bid form asks for length. Tonnage still requires the published weight of the specified section.
Not unless the estimate says so. Connection hardware is a separate line when it is defined, or an open item when it is not.
Fabrication and erection are different costs. The request should say which one the package covers.