Documents and inputs
- Concept plans and gross floor areas
- Project type and intended quality level
- Location and schedule assumptions
Use an early estimate to compare building options while the drawings are developing. We measure scope that the plans define and identify allowances for systems your team still needs to select.

Send concept plans, gross floor area, building use, and the decision the number needs to support.
Most estimates from concept drawings are delivered in 24–48 hours. Fees are typically $150–$1,000 per estimate, depending on project size and scope.
Use it for feasibility or to compare design options while systems are still open. Known scope is measured from the sketches you have. Unchosen structure, envelope, or MEP systems stay allowances with the assumption written beside them. When issued-for-bid drawings arrive, those allowances should be replaced with measured quantities rather than carried forward as if they were a final price. The design stage is printed on the estimate so a concept total is not reused on bid day by mistake.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Gross floor area | SF | Concept plan | Reference area only, not a system quantity |
| Known assembly | Measured unit | Any sheet that defines it | Only where dimensions exist |
| Open system allowance | Named allowance | Assumption log | Structure, envelope, or MEP still undecided |
| Design-stage label | Text | Cover of the estimate | Stops a concept total being reused as a bid |
Share concept drawings, gross floor areas, intended building use and the proposed structural and MEP systems. Note which decisions remain open. A preliminary estimate should separate known scope from allowances rather than give incomplete drawings the appearance of a fully measured tender package.
Define the decision the estimate needs to support: feasibility, a design option or the next funding discussion. Record the design stage and assumptions with each version. When detailed plans become available, replace provisional allowances with measured quantities and current pricing inputs rather than carrying an early concept total into the bid unchanged.
Preliminary estimates communicate design maturity, uncertainty and unresolved scope rather than false line-item precision.
A preliminary commercial estimate supports early feasibility decisions when design information is incomplete; ranges and assumptions should be explicit.
Illustrative early design range: a conceptual 10,000 SF building at an assumed $150 to $190 per SF gives $1.5M to $1.9M before project-specific exclusions. The rates are hypothetical, not current benchmarks.
They can produce a qualified early number. They cannot honestly produce the same line-item precision as an issued-for-bid set. Open systems stay visible as allowances.
State the building use and the intended quality, such as a shell warehouse versus a finished medical office. Those choices change assemblies even when the floor area is similar.
Assumptions and missing information are listed next to the figures they affect. A single unexplained total is not the deliverable.
Early-stage estimates have greater uncertainty and should not be presented as fixed bids.