Commercial metal framing splits structural cold-formed framing from interior studs. Gauge names alone do not set the steel thickness.

Send partition types, stud depth and spacing, and say whether exterior load-bearing studs are in this package.
Stud and track packages typically fall in the $150–$1,000 range per estimate, based on project size and scope. Most estimates are delivered in 24–48 hours.
Studs are counted from spacing and wall length, then adjusted for ends, openings, and jambs. A 20-foot wall at 16 inches on center has 15 spaces and typically 16 studs before those adjustments. Track, headers, deflection track, and backing are separate rows. Load-bearing walls are not priced on the same line as non-load-bearing partitions. The workbook records depth and the specified thickness, because a gauge label can be ambiguous. Delegated engineering is excluded unless the request includes it.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Interior studs | EA | Partition type | Depth, spacing, and height |
| Track | LF | Floor and head of wall | Top and bottom separately if sizes differ |
| Opening framing | EA | Door and window schedule | Jambs and headers |
| Load-bearing studs | EA | Structural sheets | Not mixed with partition studs |
Separate load-bearing framing from interior partitions. Record stud depth, design thickness or gauge designation, spacing and height; take off tracks, headers, jambs, bracing and backing independently.
Structural design and delegated engineering are separate from measurement. Nominal gauge labels alone may not establish the specified steel thickness.
Illustrative studs at 16 in on center across a 20 ft uninterrupted wall: 240 / 16 = 15 spaces, normally requiring 16 studs before end conditions, openings and waste.
It is the uninterrupted-wall count. Corners, openings, and king studs change it. Those extras are listed, not guessed as a percentage, unless you ask for a stated waste allowance.
On its own row when the interior elevations show blocking. It is not included in the stud spacing count.
Not always. The estimate keeps them apart until you say they are one package.