+1 (317) 751-5969💬 WhatsApp (+1 (317) 452-0587)✉️ info@commercialestimatepro.com
US commercial bids first. Canada, UK, Australia, and UAE on request.
TRADE INSIDE A BUILDING BID

Commercial Masonry Takeoffs for CMU and Brick

Get masonry quantities by wall type and bond for a commercial bid. Review opening deductions by elevation and reconcile CMU, veneer, grout and lintels against the specified assemblies.

partially built commercial concrete-block wall with brick veneer samples, mortar joints and a mason laying blocks.
Construction estimating visual
PROJECT INQUIRY

How do I request this commercial estimate?

Send elevations, wall types, and the opening schedule, and state the opening-deduction rule you want used.

Masonry is typically $150–$1,000 per estimate. The amount tracks project size and scope, and 24–48 hours covers delivery for most estimates.

  • Opening deductions and wall heights
  • Scaffolding and access requirements
  • Weather barriers and veneer support

Request a Commercial Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

DIRECT ANSWER

How is a commercial masonry wall measured?

Each wall type is an area by length and height, minus openings under the rule you specify. A 48 by 12 foot wall is 576 SF gross. One 6 by 7 foot opening deducts 42 SF, leaving 534 SF net before bond and waste. CMU and brick veneer are not the same row. Grout is based on the specified cells, not on an assumed solid wall. Lintels, ties, and control joints are counted from the details. Scaffold and weather-barrier ownership are written exclusions.

SCOPE AND DELIVERABLES

What should the workbook list?

01

Drawings to send

  • Architectural wall plans and elevations
  • Masonry wall types and reinforcement details
  • Lintel and opening schedules
02

What is counted

  • Wall area by CMU or brick assembly, using the stated opening deduction
  • Grout and reinforcing where the details show them
  • Lintels, ties, control joints, and flashing
  • Veneer and backup measured on separate lines
03

Scope checks

  • Opening deductions and wall heights
  • Scaffolding and access requirements
  • Weather barriers and veneer support
04

CSI MasterFormat

  • CSI MasterFormat Division 04
05

Industry takeoff software

  • Masonry quantities are commonly measured with PlanSwift, Bluebeam, or similar on-screen takeoff software. Those names are tools used in the industry. This site does not claim a license for them, and it does not claim their native files are the deliverable. The package described here is an Excel workbook, with color-coded PDF markups when the written quote includes them.
ILLUSTRATIVE LINES

Sample line items for this scope

These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.

Line itemUnit or basisDrawing referenceReview note
CMU wall areaSFWall type and elevationNet of stated opening rule
Brick veneerSFElevationsSeparate from CMU backup
Grout and reinforcingAs specifiedWall sectionsOnly the cells or zones detailed
LintelsEAOpening scheduleNot included in wall SF
MEASUREMENT NOTES

How is this scope measured?

Measurement method for CSI division 04

Measure each wall type by elevation and thickness, using the stated opening-deduction rule. Separate CMU and veneer areas, grouted cells, reinforcement, lintels, ties and flashing; convert area into unit counts only with the specified module.

Check scaffold access, veneer support and weather-barrier ownership. Grout should follow specified cells or zones rather than an assumed solid-wall volume.

Teaching calculation

Illustrative wall: 48 ft long x 12 ft high = 576 SF gross. A 6 ft x 7 ft opening deducts 42 SF, leaving 534 SF net before bond pattern and other adjustments.

QUESTIONS

Questions about Commercial Masonry Takeoffs for CMU and Brick

When are openings deducted?

When the measurement rule you confirm says so. The deduction is shown, not absorbed silently.

How do you get unit counts from area?

Only with the specified module size. Area is not converted to block or brick counts without that module.

Is veneer support in the masonry number?

Relief angles and veneer support are included only when the structural and architectural sheets assign them to the mason. Otherwise they are flagged.

SCOPE BOUNDARIES

What this page does not decide

Inclusions, exclusions, and whether this trade is in your package are confirmed in the project quote. This page does not certify design or code compliance. PlanSwift and Bluebeam are named only as tools used in the industry.

CONTACT THE DESK ↗