+1 (317) 751-5969💬 WhatsApp (+1 (317) 452-0587)✉️ info@commercialestimatepro.com
US commercial bids first. Canada, UK, Australia, and UAE on request.
TRADE INSIDE A BUILDING BID

Commercial Electrical Estimating and Takeoffs

Send the electrical drawings for an Excel takeoff organized by fixture type, branch devices, feeder raceways and equipment. The quote confirms whether you need quantities or priced scope.

organized commercial electrical room with switchgear, conduit bends, cable trays and a technician in protective equipment inspecting a panel.
Construction estimating visual
PROJECT INQUIRY

How do I request this commercial estimate?

Send electrical plans, the luminaire schedule, panel schedules, and say whether fire alarm, data, and controls are in this package.

An electrical takeoff is typically $150–$1,000 per estimate, varying by project size and scope, and most estimates are delivered in 24–48 hours.

  • Low-voltage and fire alarm scope boundaries
  • Feeder and branch circuit assumptions
  • Drawing revisions and alternates

Request a Commercial Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

DIRECT ANSWER

How should commercial electrical quantities be split?

Count luminaires by type, not as one EA bucket. Branch devices, equipment connections, and feeder raceway are different rows. A drawn route length is not conductor length: record conductor count, vertical rises, and terminations separately. The Excel sheet uses columns for tag, unit, sheet, and whether the item is base bid or an alternate. Temporary power is included only when the specifications put it in this contract.

SCOPE AND DELIVERABLES

What should the workbook list?

01

Drawings to send

  • Electrical plans and panel schedules
  • Lighting fixture schedules
  • Electrical specifications and addenda
02

What is counted

  • Luminaires by type, with emergency fixtures on their own line
  • Branch devices, disconnects, and equipment connections
  • Raceway by size, with conductor count recorded separately from route length
  • Panels, switchgear, and transformers by schedule tag
  • Fire alarm, data, and controls only when the documents assign them to this package
03

Scope checks

  • Low-voltage and fire alarm scope boundaries
  • Feeder and branch circuit assumptions
  • Drawing revisions and alternates
04

CSI MasterFormat

  • CSI MasterFormat Division 26
05

Industry takeoff software

  • Electrical quantities are commonly measured with PlanSwift, Bluebeam, or similar on-screen takeoff software. Those names are tools used in the industry. This site does not claim a license for them, and it does not claim their native files are the deliverable. The package described here is an Excel workbook, with color-coded PDF markups when the written quote includes them.
ILLUSTRATIVE LINES

Sample line items for this scope

These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.

Line itemUnit or basisDrawing referenceReview note
Luminaires by typeEALuminaire scheduleKeep emergency fixtures separate
Branch devicesEAPower planReceptacles and disconnects are not one mix
Feeder racewayLFOne-line and riserConductor count is a different column
Panels and gearEAPanel scheduleTag each panel; do not lump gear

A related teaching file is available: Electrical takeoff worksheet (illustrative). It is not a bid deliverable.

Open the source-mapped quantity excerpt for this trade.

MEASUREMENT NOTES

How is this scope measured?

Measurement method for CSI division 26

Reconcile the one-line diagram with panel schedules before counting branch devices. Keep fixtures by type, equipment connections by tag and feeders by conductor size and raceway. A drawn route length is not automatically the conductor length: record conductor count, vertical rises and termination allowances separately.

Confirm whether fire alarm, data, controls and temporary power belong to this package; their presence on a drawing does not establish electrical-contractor ownership.

Teaching calculation

Illustrative lighting count: 14 fixtures on Level 1 plus 11 on Level 2 equals 25 EA. Reconcile fixture types with the luminaire schedule; circuits, homeruns and controls require separate scope lines.

QUESTIONS

Questions about Commercial Electrical Estimating and Takeoffs

Does a lighting count include homeruns and circuits?

No. Scheduled fixtures, controls, raceway, and panels are separate lines. A teaching count of 14 fixtures on Level 1 plus 11 on Level 2 is 25 EA of fixtures only.

Where do fire alarm and data belong?

They belong in this package only when the drawings and specifications assign them to the electrical contractor. Presence on a sheet does not decide ownership.

How are panel schedules used?

Reconcile the one-line with the panel schedule before counting branch devices. Note AIC, voltage, and mounting when the schedule states them. Do not invent missing circuit data.

SCOPE BOUNDARIES

What this page does not decide

Inclusions, exclusions, and whether this trade is in your package are confirmed in the project quote. This page does not certify design or code compliance. PlanSwift and Bluebeam are named only as tools used in the industry.

CONTACT THE DESK ↗