Drawings to send
- Door and window schedules
- Opening elevations and details
- Hardware and performance specifications
Get an openings schedule for commercial bidding. The takeoff reconciles floor-plan marks with door, window and hardware schedules so your team can price leaves, frames, glazing and hardware sets on the right basis.

Send the door schedule, window schedule, and elevations, and say whether hardware and installation are both required.
Schedules for doors and windows are typically $150–$1,000 per estimate, and project size and scope set that fee. Most estimates are delivered in 24–48 hours.
Nine single doors and three double-door openings can be 12 openings and 15 leaves. The estimate uses the basis the bid needs and labels it. Frames, glazing, and hardware sets are additional rows keyed to the same mark. Fire and acoustic ratings come from the schedule. Storefront that is drawn as a window may belong to the glazing package instead. The Excel file has a mark column so a leaf, a frame, and a hardware set for opening 101 stay tied together without being one price.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Door leaves | EA | Door schedule | Singles and doubles identified |
| Frames | EA | Door schedule | Rating column filled from the schedule |
| Hardware sets | EA | Hardware schedule | Not assumed from the leaf count |
| Windows | EA or SF | Window schedule | Separate from storefront packages |
Reconcile opening marks across plans, elevations and schedules. Separate leaves, frames, glazing and hardware sets by size, material, rating and operation.
Clarify storefront and curtain-wall interfaces, installation, finish and owner-furnished items. A door count is not a complete hardware schedule.
Illustrative opening schedule: 9 single doors and 3 double-door openings are 12 openings, but 15 door leaves; define the count basis before pricing.
A double door is one opening and two leaves. Pricing the wrong basis changes the material order.
Sometimes. The schedule and the specification decide. The exclusion register should name the owner of storefront and curtain wall.
Yes, if installation is in the contract. The row is tagged owner-furnished so the material is not purchased again.
Inclusions, exclusions, and whether this trade is in your package are confirmed in the project quote. This page does not certify design or code compliance. PlanSwift and Bluebeam are named only as tools used in the industry.