Documents to send
- Retail plans
- Storefront elevations
- Landlord work letter
A retail estimate follows two documents at once: the landlord work letter and the brand prototype. Storefront glass is not the sales-floor finish.

Send the work letter, prototype drawings, and say whether the center is occupied during construction.
Landlord delivery, such as the slab, storefront opening, and utility stubs, is listed before tenant finishes, fixtures, and signage. Three storefront openings do not become glazing square feet until the elevations give width and height. Brand finishes stay on their own rows so a prototype change does not rewrite the landlord scope. After-hours work and occupied-mall access are pricing qualifications, not measured quantities. The workbook has a column for landlord versus tenant so the two bids cannot be merged by accident.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Storefront opening | EA then SF | Elevations | Size required before glass SF |
| Sales-floor finish | SF | Finish plan | By brand product |
| Fixtures | EA | Fixture drawings | Owner-furnished flag |
| Signage and power | EA | Sign drawings | Separate from storefront |
Use the landlord work letter alongside the brand finish package. Separate landlord storefront and utility provisions from tenant fixtures, signage and equipment connections; occupied-center access and after-hours work belong in the pricing qualifications.
For an illustrative retail fit-out, 3 storefront openings do not establish glazing SF without opening dimensions and a storefront schedule.
Only when the work letter puts it there. Otherwise it stays a landlord line with the opening size shown.
Owner-furnished fixtures are tagged. Installation, backing, and power connections can still be in the tenant estimate if the drawings show them.
Both are logged and the conflict is an open question. The estimate does not pick a silent winner.
A building type is not a completed portfolio and does not mean every trade is offered on every project. Deliverables are confirmed in the quote.