A tenant improvement estimate starts with what is already there. Demolition, reuse, and new work are three different quantities.

Send existing-condition drawings, demolition plans, and the landlord delivery description.
Removal quantities come from the demolition plan. New partitions and finishes come from the proposed plan. A teaching split of 900 SF of new partition and 250 SF of demolition stays on two rows. Existing MEP capacity is a coordination note, not a new-equipment count, unless the drawings add equipment. Concealed conditions are open items, not assumed repairs. The Excel file marks each row as demolish, remain, or new so a landlord delivery item is not bought again by the tenant.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Demolition | SF or EA | Demolition plan | Separate from new work |
| New partitions | SF | Proposed plan | Wall tag required |
| Reuse or remain | EA or LF | Existing plan | Tagged so it is not purchased |
| MEP changes | EA or LF | Tenant MEP | Capacity limits noted, not assumed |
Start with existing-condition and demolition drawings, then distinguish removals, reuse, relocation and new work. Reconcile landlord delivery conditions, tenant improvements, existing MEP capacity and occupied-area protection; confirm survey limitations instead of assuming concealed conditions.
For an illustrative tenant improvement, 900 SF of new partition and 250 SF of demolition should remain separate line items and scope responsibilities.
Sometimes the same wall is removed and replaced, and sometimes it is not. The drawings decide. The rows stay separate either way.
Quantities that depend on hidden conditions stay open. The estimate does not invent them.
Only when the work letter moves them to the tenant. Otherwise they are excluded with a reference to the letter.
A building type is not a completed portfolio and does not mean every trade is offered on every project. Deliverables are confirmed in the quote.