Documents to send
- Kitchen equipment plans
- Exhaust and grease details
- Dining finish schedules
A restaurant estimate is a coordination problem between the kitchen equipment schedule and the MEP sheets. The dining-room finish is the smaller risk.

Send the equipment schedule with plumbing, electrical, and hood drawings, and mark which appliances are owner-furnished.
Each piece of kitchen equipment is checked for water, waste, gas, power, and exhaust. Eight connections on a schedule are not eight identical prices. Grease waste and roof penetrations for the hood cross several trades and are assigned once. Owner-furnished appliances are tagged so the contractor prices installation and rough-in only. The dining room can use ordinary finish takeoff. The workbook lists equipment tag, utility, and the trade that owns the connection.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Kitchen equipment connections | EA by tag | Equipment schedule | Water, gas, and power split |
| Hood and exhaust | EA or LB or SF | Mechanical hood sheets | Suppression noted |
| Grease waste | LF | Plumbing plan | Separate from domestic waste |
| Dining-room finishes | SF | Finish plan | Not used to price the kitchen |
Coordinate the kitchen equipment schedule with plumbing, power, gas, hood exhaust and suppression drawings. Identify owner-furnished appliances and contractor installation; grease waste and roof penetrations often cross package boundaries.
For an illustrative restaurant, 8 kitchen equipment connections should be reconciled with the equipment schedule; do not infer plumbing or electrical scope from the equipment count alone.
No. Hood, exhaust duct, and suppression are measured from the mechanical and fire-protection sheets.
Whoever the schedule marks as furnished by owner or by contractor. The estimate follows that mark and does not assume it.
When the plumbing sheets show them. Civil or landlord work outside the building is called out if the drawings put it there.
A building type is not a completed portfolio and does not mean every trade is offered on every project. Deliverables are confirmed in the quote.