Documents to send
- Exam room plans
- Power and plumbing layouts
- Finish schedules
Send the room schedule and equipment drawings for a medical office construction estimate. We group exam and procedure rooms separately and use the work letter to identify landlord and tenant scope.

Send the room schedule and equipment plan, and say whether medical gas or special ventilation is actually on the drawings.
Group exam rooms separately from procedure rooms. Six exam rooms and two procedure rooms are not eight identical rooms if the equipment and plumbing differ. Sinks, casework, and power for owner equipment are counted from those rooms. Do not add medical gas or operating-room air systems that the documents do not show. Landlord shell versus tenant build-out follows the work letter. The Excel grouping is by room type so a later suite in the same building can be compared without copying the wrong services.
These rows show how a commercial workbook can separate units. They are teaching lines, not a client bid and not a price.
| Line item | Unit or basis | Drawing reference | Review note |
|---|---|---|---|
| Exam rooms | EA | Room schedule | Finishes and sinks per room |
| Procedure rooms | EA | Room schedule | Separate from exam rooms |
| Owner equipment power | EA | Equipment plan | Backing called out if drawn |
| Tenant partitions | SF | Tenant plan | Shell excluded when split |
An examination suite and an outpatient procedure space can have different utility and finish requirements. Reconcile room data, casework, sinks and equipment connections without assuming medical gas or special ventilation is needed in every medical office.
For an illustrative medical office, 6 exam rooms and 2 procedure rooms should be grouped separately because equipment and MEP requirements differ.
No. Add it only when the drawings show outlets and piping. Many offices have none.
The equipment schedule decides. Owner-furnished equipment can still need contractor power and backing.
The room-by-room check is similar. The systems on the sheets are usually simpler, and the estimate should not import hospital scope that is not drawn.
A building type is not a completed portfolio and does not mean every trade is offered on every project. Deliverables are confirmed in the quote.